THE Metropolitan Manila Development Authority (MMDA) has proposed the construction of rainwater impounding facilities inside Camp Aguinaldo to ease recurring flooding on EDSA, with the proposed design released on Wednesday, Aug. 27.
The plan requires detention ponds that will temporarily store excess rainwater during downpours and gradually release it into the EDSA drainage system, leading to the Makiling Creek.

As proposed, the project will be implemented in three phases, covering 182 hectares and involving a golf course near Gate 2, another near Gates 3 and 4, and an open space near Gate 6.
For the first phase near Gate 2, the detention pond has a 361-meter perimeter, a 4,650-square-meter area, an 8-meter depth, and a 37,200-cubic-meter capacity, designed for a 25-year return period (15.6 mm per hour over 24 hours), exceeding the needed 36,945 cubic meters.
MMDA’s schematic shows that under normal weather, the water bypasses the pond and flows through the lagoon to EDSA.
During heavy rain, floodgates divert water flow into the pond; after rain, pumps discharge stored water slowly into EDSA toward the Makiling Creek.
MMDA proposes rainwater facilities in Camp Aguinaldo to mitigate EDSA flooding
The scope of works covers the impounding area, operations and powerhouse, drainage and electromechanical works, and landscaping and golf course restoration, with a treatment facility under consideration., This news data comes from:http://nygtny.jyxingfa.com
Officials said operations and maintenance arrangements, and a memorandum of agreement, are still under discussion.
- Jollibee, DepEd partner to develop quick service restaurant curriculum for senior high
- SSS pension reform program starts in September
- Pope Leo XIV to Israeli president: 2-state solution needed to end Gaza war
- 'Pink and green' protests call for a reset in Indonesia
- Argentine police recover Nazi-looted painting spotted in property ad
- Australia's mushroom murderer faces victims' family in court
- Five journalists among 20 killed in Israeli strikes on Gaza hospital
- Govt debt swells to record P17.58T
- Discaya companies' licenses revoked for bid-rigging
- Pagasa monitors LPA off Cavite, may still become tropical depression